Page 5
... first class Reinforced concrete bridges and culverts completed Successful deep wells completed kilometers .... 368.5 number ... 200 do .. 122 Reinforced concrete buildings completed - including only buildings of over 100 cubic meters ...
... first class Reinforced concrete bridges and culverts completed Successful deep wells completed kilometers .... 368.5 number ... 200 do .. 122 Reinforced concrete buildings completed - including only buildings of over 100 cubic meters ...
Page 6
... first time , but also because of the occasional loss of a structure . The above figures are obtained from semiannual reports of District Engineers , which are submitted for new territory at the earliest date permitted by conditions ...
... first time , but also because of the occasional loss of a structure . The above figures are obtained from semiannual reports of District Engineers , which are submitted for new territory at the earliest date permitted by conditions ...
Page 8
... First ton Each ad- of ditional capacity . 500 kilos . P50 , 00 P4.00 10.00 2.00 25.00 3.00 Other four - wheel motor vehicles operated for hire , 0.20 per horsepower plus 20 . Motorcycles of two or three wheels , P3 . All other motor ...
... First ton Each ad- of ditional capacity . 500 kilos . P50 , 00 P4.00 10.00 2.00 25.00 3.00 Other four - wheel motor vehicles operated for hire , 0.20 per horsepower plus 20 . Motorcycles of two or three wheels , P3 . All other motor ...
Page 9
... first bronze work of the kind undertaken in the Islands , is distinctly metropolitan in its character , and as well being significant of the marked improve- rchitectural decorations , has produced until recently , an American ...
... first bronze work of the kind undertaken in the Islands , is distinctly metropolitan in its character , and as well being significant of the marked improve- rchitectural decorations , has produced until recently , an American ...
Page 11
... first - class road location that the status of the road may be raised from trail to first - class as funds are made available . Heavy rock - work characterizes the construction on both sides of the Pasaleng Valley , where the Caraballos ...
... first - class road location that the status of the road may be raised from trail to first - class as funds are made available . Heavy rock - work characterizes the construction on both sides of the Pasaleng Valley , where the Caraballos ...
Other editions - View all
Common terms and phrases
administration Albay Ambos Camarines appropriation artesian automobile barrio Batangas Benguet Bontoc bridge built Bulacan Bureau of Public Cagayan caisson Capiz carts Cebu cement cent centavos centimeters completed concrete piles construction contract cost Cotabato cubic meters culverts district engineer feet first-class road funds grading gravel haul heavy Ilocos Ilocos Norte Iloilo inches installed Insular irrigation Islands Jose kilometers labor Lanao loan Maguindanaos maintenance Manila Marinduque materials Misamis months Mountain Province municipality Nueva Ecija Nueva Vizcaya operation Pampanga Pangasinan Parang Pasig passable Philippine pier pipe placed plant present presidencia provincial building pumping quarter rains rainy season Reconstruction reinforced concrete Repair and altera resurfacing rice River Rizal Road is progressing road roller rock school building Sorsogon spans standard plan started steel stone stream structure subgrade subprovince surfacing telephone line timber tion Total town traffic trail transportation trusses water rights water supply waterworks wooden Zamboanga